  WILLIAMS  COUNTY  HEALTH  DISTRICT
About Us

 

CHANGING OWNERSHIP, ALTERING, OR CONSTRUCTING A

FOOD SERVICE OPERATION OR RETAIL FOOD ESTABLISHMENT

            These requirements also apply to mobile, seasonal, catering, and food delivery sales operations.

1.                  The facility layout and equipment specifications must be submitted to the Health Department and will be acted upon within thirty days of receipt and a response letter will be issued. The facility layout and equipment specifications must be legible, drawn reasonably to scale, confirm that applicable provisions of OAC 3717-1 can be met and include the following information in order for approval to be considered:

A.                 Type of food service operation or retail food establishment proposed and the foods to be prepared and served.

B.                 A floor plan of the entire premises of the food service operation or retail food establishment showing the general layout of fixtures and other equipment.

C.                 The total area to be used for the food service operation or retail food establishment including square footage.

D.                 All portions of the premises in which the food service operation of retail food establishment are to be conducted.

E.                  For mobile, seasonal, catering, and food delivery sales operations, any food preparation not conducted on site, must be conducted in a licensed facility and the name and address provided.

F.                  Entrances and exits.

G.                 Location, numbers, and types of plumbing fixtures, including all water supply facilities.  Also include all sewer lines, floor drains, grease inceptors, etc.

H.                 Plan of lighting, both natural and artificial, with foot-candles indicated for critical surfaces.

I.                    List of building materials and surface finishes to be used.

J.                   List of equipment with manufacturers and model numbers.  Must be approved by this department prior to installation.

K.                 If this is a catering facility adjoining your home, you must provide plans demonstrating how the business will be completely separated from any living or sleeping quarters.

L.                  Plan for outside storage areas (trash, grease receptacles, etc.)

M.                Completed application for facility layout and equipment specification review (see attached).

2.         You are also required to contact the following agencies if applicable:

A.                 Contact local zoning officials to verify zoning requirements if you are constructing a new building - Township Trustees or Village Official.

B.                 Contact State Building, Electrical, and Plumbing Inspector (Division of Industrial Compliance):  1-800-686-1597 (District office) or 1800-523-3581(Central office).

C.                 Contact EPA if necessary – This is required if the business is not on public water or sewer systems.  1-800-686-6930.

D.                 Contact the Local Fire Chief in reference to ventilation systems.  They may refer you to the State Fire Inspector

3.         Please be aware that any change made to plans that have already been approved by the health department, must also be submitted to the health department for approval.  Failure to do this may result in disapproval of license at the time of the pre-licensing inspection.  

4.                   A progress inspection may also be scheduled (at your request) at any time to verify that the construction is progressing as per the initially approved plans and the expectations of the department.  This also helps to eliminate or reduce last minute corrections or changes.

5.                   Apply for a license not less than 10 days prior to opening/operation.  (A plan approval letter is required)

6.                   Schedule a pre-licensing inspection with the health department.  At this time you may be required to provide a copy of the certificate of occupancy or temporary certificate of occupancy obtained from the building inspector.  All construction must be complete and the facility clean of construction debris also, all equipment must be installed and in operation (such as refrigeration/freezer units) at the time of this inspection.

Please see equipment / materials guidelines and equipment list/ plans worksheet attached

__________________________________________________________________________________________________________

FOOD SERVICE OPERATION OR RETAIL FOOD ESTABLISHMENT

FACILITY LAYOUT AND EQUIPMENT SPECIFICATION REVIEW APPLICATION

 

Please attach a menu or list of foods to be prepared/sold to this sheet.  Also indicate types of preparation that will apply (i.e. cooking, hot/cold holding, cooling, reheating, thawing, etc.)

Date:___________________________

Reason for application:                       New ownership_______    Altering existing facility_______     New construction________

Name of Establishment:___________________________________________________________________________________

Category:               Restaurant:_____                     Mobile unit:_____          Retail establishment:_____     Institution:_____     Daycare:_____                                                Catering:_______     Other:_____  explain:______________________________________________________

Address:________________________________________________________________________________________________

Phone (if available):_______________________________________________________________________________________

Name of owner:__________________________________________________________________________________________

Mailing address:__________________________________________________________________________________________

Telephone:______________________________________________________________________________________________

Applicant’s name:_________________________________________________________________________________________

Title (owner, manager, architect, contractor, etc.):________________________________________________________________

Mailing address:___________________________________________________________________________________________

Telephone:_______________________________________________________________________________________________

I have submitted plans/applications to the following authorities on the following dates:

Local zoning officials:__________________

State building, electrical, and plumbing (Division of Industrial Compliance):____________________

Ohio EPA:________________________

Local fire Chief:________________________

Other:________________________

Hours of operation:             Sunday____________      Monday____________     Tuesday____________                                                                                                      Wednesday____________ Thursday____________   Friday____________         Saturday____________   

Number of seats:___________________________

Number of staff (max per shift):_________________________

Total square feet of facility:____________________________                     Number of floors:________________________________

Meals to be served (check all that apply):       Breakfast____________   Lunch____________   Dinner____________

Type of services (check all that apply):           Sit down meals_______    Take out_______     Caterer_______     Mobile vendor_______ Other:_____  explain:_______________________________________________________

Water supply obtained from:     Well___________   Public water facility__________  Bottled water__________   Other____________

Projected date for completion of project:____________________________________________________________________________

SLnew1 02/13/02

___________________________________________________________________________________________________________________

EQUIPMENT / MATERIALS GUIDELINES

PAGE 1 OF 2

 

In determining the equipment needed in a food service operation a complete list of menu items is required.

The following is a list of requirements and may vary slightly based upon menu items, size of facility, type of operation, etc;

EQUIPMENT

All equipment must be NSF approved or is at the discretion of the health department.  Equipment must be smooth, easily cleanable and free of difficult-to-clean internal corners and crevices, and free of breaks, open seams, cracks, chips, pits, and similar imperfections (Example: homestyle refrigerators and crockpots are just two examples of equipment not acceptable for commercial use).

v      Any wood cabinets, shelving, etc. must be sealed (Example: varnished, painted, or covered with contact paper).

v      Refrigeration Equipment must be able to maintain temperatures of 41°F or below and free of damage that may compromise the quality or cleanability of the equipment (Example: broken doors, damaged seals/gaskets/interior finishes, etc.)

v      Hot holding equipment must be able to maintain temperatures of 140°F or above and free of damage that may compromise the quality or cleanability of the equipment.  This equipment must also have the ability to adjust temperature to varying temperatures (three temperature settings or less such as low, medium, and high is not sufficient)

v      Cooking equipment must be able to maintain temperatures of at least 165°F and free of damage that may compromise the quality or cleanability of the equipment.  This equipment must also have the ability to adjust temperature to varying temperatures (three temperature settings or less such as low, medium, and high is not sufficient)

v      Any equipment that is not portable or easily movable must be elevated on legs or sealed to floor or other equipment.  Unless sufficient space is provided for easily cleaning between, behind, and above fixed equipment, the equipment shall be sealed to the adjoining equipment or adjacent walls or ceiling.

v      Equipment, single service items, food, etc. cannot be stored under exposed or unprotected sewer or water lines (with the exception of sprinkler system lines).

PLUMBING FIXTURES

Water must be obtained from an approved source and of sufficient capacity/quantity.

All equipment must be NSF approved or is at the discretion of the health department

All applicable equipment must have plumbing providing hot water.

All plumbing shall be equipped with backflow prevention devices or vacuum breakers or air gapped.

v      Three compartment sink with dual drainboards (this sink must be directly connected to sewer drain (based on Ohio plumbing code), can not be used for food preparation, hand washing or the disposal of mop water).  This sink cannot contain a garbage disposal.

v      Food prep sink (this sink must be indirectly connected to sewer drain, can not be used for hand washing or the disposal of mop water)

v      Hand wash sink (a minimum of one is required and additional may be required depending on the size of the facility)

v      Mop/utility sink (this sink must be directly connected to sewer drain and can not be used for hand washing)

v      Grease interceptor/trap (garbage disposals can not discharge into grease traps)

v      Restroom facilities (quantity determined by state building inspector)

v      Mobile operations must provide alternative methods for water supply/waste disposal for situations where water supply/ sewer connections are not available. 

FLOORS, WALLS, CEILINGS

The floors, walls/wall coverings and ceilings of all food preparation, food service, food storage, equipment and utensil washing areas, garbage or refuse storage rooms, walk-in refrigeration units, dressing rooms locker rooms toilet rooms and vestibules shall be constructed of smooth durable non absorbent material such as sealed concrete, terrazzo, ceramic tile linoleum or tight wood impregnated with plastic.  The junctures between walls and floors shall be covered and sealed.  Tight woven carpet and exposed studs, joists, and rafters that have been finished to provide an easily cleanable surface may be used in areas such as dining room (Exposed studs, joists, rafters, and carpeting is prohibited in areas of food preparation, equipment and utensil washing, food storage areas, toilet rooms)

Exposed pipes shall not be installed running along the floor (this prevents proper cleaning).

Exposed utility service lines and pipes shall only be installed running along walls and ceilings if necessary and should be installed so not to obstruct cleaning. 

______________________________________________________________________________________________________________________

PAGE 2 OF 2

OPENINGS TO OUTSIDE

“Except as permitted for mobile units”, shall be protected by tight fitting self closing doors, closed windows, screening (free of breaks and not less than 16 mesh to the inch), controlled air currents, etc.

LIGHTING

50 foot-candles of light is required on all food preparation surfaces, were employees are using equipment such as slicers, knives, etc. and equipment/utensil washing areas.

20 foot-candles is required (30 inches from floor ) in employee toilet and hand washing areas, and public dining /restroom areas during cleaning.  Also customer self service areas  (such as buffets and retail food establishments) and in reach-in and under the counter equipment.

10 foot-candles is required (30 inches from floor) in walk-in refrigeration units, dry food storage areas, equipment/utensil storage areas, and other areas during cleaning.

All lights must be shielded or use shatter proof bulbs

EMPLOYEE AREA

Sufficient area must be provided for the storage of employee clothing and belongings. These areas are limited to separate dressing rooms or storage rooms with no open food.

LIVING QUARTERS AND LAUNDRY

No portion of a food service operation shall be conducted in any room used as living or sleeping quarters (Example: Catering kitchens must be separate from household kitchens).   Food service operations shall be separated from any living and/or sleeping quarters by complete partitioning and solid, self-closing doors with an intervening vestibule or public area, except those operations exempted by the director.

Laundry facilities shall be restricted to washing and drying of linens, cloths, uniforms, and aprons necessary to the operation.  If dried, an electric or gas dryer shall be provided and used.  Separate rooms shall be provided for laundry facilities or in store rooms containing only packaged foods or single-service articles.

SLnew2 02/13/02